KGK - Time-tested technologies!

Caspian Hydra Technologies

Caspian Hydra Technologies, LLC entered the Russian market in 2009 and through the years of efficient performance has successfully proven its reputation and expertise through the implementation of such significant projects as construction of the Aktau and Temryuk Ports, the Bronka Terminal, Volga-Caspian Canal Federal State Unitary Enterprise “Rosmorport”, as well as Dredging and Spools installation at the V. Filanovsky and Y. Korchagin oilfields in the North Caspian sea.

The Company’s business area involves performance of the full range of hydraulic-engineering works, including but not limited to dredging, backfilling, territory nourishment, diving operations, and shore reinforcement activities as well as chartering and operation of a specialized fleet designated for rendering support services at offshore and marine oil & gas fields.

We are certified according to International Standard Organization (ISO 9001,2008) and possess a valid SRO Certificate.

Our team consists of highly qualified hydraulic-engineers, masters, dredgemen, and divers. In addition to the above we have our in-house training center, which allows us to qualify offshore personnel for the required activities according to international quality and HSE standards if needed.

The Company possesses up-to-date dredging spread, sophisticated equipment, and diving systems applicable for all kinds of underwater activities.

We quickly respond to the rapid changes of the market environment in order to meet the growing demands of the most discerning clients.



 The strategic goal of OOO KGK 

is to become a leader among companies operating in two fields. The first is the market for developing and implementing projects of dredging, building hydraulic engineering structures, land reclamation, and reinforcing shorelines, including diving support for all types of marine construction work. The second is the field of ship management and freight vessels for supplying marine exploration and production facilities.

 Tactics 

— build capacity as the most preferred contractor to perform work at sea by increasing the quantity of services rendered at a high professional level and following the growing needs of customers.

 Mission 

— high quality and professional performance of undertaken obligations.




News

  Caspian Hydra Technologies

LLC joined TOP-15 leaders under the Federal Statistic Ranking of Business Units

MLSP-2: Helicopter pad operation starting
 10 Aug 2017

The helicopter for personnel changeover (shift rotation) of Lukoil PJSC (LUKOIL-Nizhnevolzhskneft) contractor has made the first regular landing at MLSP-2, V.Filanovskiy field.

As of today, the scope of tasks assigned to offshore helicopters is fairly extensive. First, it is the transportation of passengers and cargo between onshore and offshore helicopter pads. Delivery by helicopter is about five times faster than by vessel, which significantly reduces time required for the project works.

Caspian Hydra Technologies LLC has handed-over to the Federal Agency for Air Transport (ROSAVIATSIYA) and started-up operation of the helicopter flights operation complex. The complex has been commissioned in accordance with the project, 1.5 months ahead of the schedule (before the contractual date). The helicopter pad allows to process up to four flights per day.

Caspian Hydra Technologies LLC is part of MSDL group of companies.

Anniversary of the Company


 31 Jul 2017

Today Caspian Hydra Technologies LLC (CHT LLC) celebrates 8 years of effective work. We would like to congratulate on this remarkable occasion our partners, colleagues and clients, such as Lukoil PSJC being the main North Caspian operator and other smaller enterprises. Owing to you, we have become a successful company, which is increasing its competitiveness year after year.

For the Astrakhan region, with the oil and gas industry being actively developed during the recent years, it is of great importance that local companies get the possibility to work in the high-tech sector. It does not only help to increase production of oil and gas, but also has a positive effect on the natural environment and social development of the region.

Our company pays special attention to social policy, advanced training and professional development programs, motivation of personnel, as superior priority for CHT is its personnel. We are glad to know that our efforts in this regard have led to excellent results.

Within eight years, we have formed a unique team of specialists, which carefully approaches searching for “know-how” solutions of production issues and implementation of innovations. We readily undertake execution of new complicated and complex projects, solution of important national tasks. The demonstrative example for this is participation in the Caspian Sea offshore development projects.

Dear Colleagues, on this remarkable day, we wish all of you sound health, happiness and well-being. Let luck and prosperity accompany you year by year!

Installation of connection bridge at V. Filanovsky field in the Caspian Sea has been completed
 12 Jul 2017

Caspian Hydra Technologies LLC, MSDL group of companies completed installation of connection bridge (CB-4) between ice-resistant fixed platform (IFP-2) and living quarters platform (LQP2) at V.Filanovskiy oil field.
The works are performed in accordance with contract for execution of marine operations on transportation and offshore installation of V.Filanovskiy oil field facilities with LUKOIL PJSC (LUKOIL-Nizhnevolzhskneft LLC).
Installation of CB-4 is performed with the use of crane with 800 tons lifting capacity located at the pipe-laying barge ARMADA INSTALLER. CB-4 connection bridge with the weight of 103 tons is installed in accordance with the design and works execution schedule.

170712_news_18_1 

LQP installation in the Caspian Sea has been successfully completed
 02 Jul 2017

Caspian Hydra Technologies LLC, a part of MSDL Group of Companies, has successfully completed installation of LQP-2 topside structure at V. Filanovsky field.
The works are performed under the Contract No 15V0495 dated 15.07.2015 with “LUKOIL-Nizhnevolzhskneft” LLC for execution of marine operations on transportation and offshore installation of objects at V. Filanovskiy field (Second stage).
Operations on installation of LQP-2 have been performed by floatover method – craneless installation with the use of transportation barge that was led between substructures and ballasted down for topside structure transfer. LQP-2 topside structure weighting about 1350 tons has been installed to design position. Works have been performed according to contractual schedule.
Caspian Hydra Technologies LLC is the only Russian company that has an experience in marine operations execution by floatover method; earlier, in April 2017, LSP-2 topside structure weighing 7150 tons was installed.

news_170702_1

Starting of LQP transportation to the Caspian Sea
 27 Jun 2017

Caspian Hydra Technologies LLC, a part of MSDL Group of Companies has started transportation of LQP-2 Topside structure of V. Filanovsky field.
These works are performed under the Contract No. 15V0495 dated 15.07.2015 with “LUKOIL-Nizhnevolzhskneft” LLC for execution of Marine Operations on transportation and offshore installation of objects at V. Filanovskiy field (second stage).
Transportation of LQP-2 Topside structure weighting about 1660 tons including mounting frame to the place of installation at the Caspian Sea is executed by transportation and installation barge “Yuri Kuvykin”, head tug and two push tugs.
Marine Operations on transportation and offshore installation of LQP-2 Topside structure are performed in accordance with contractual schedule.

news170627_1

news170627_2

Construction and loading of LQP-2 on barge for V.Filanovsky field have been successfully completed
 19 Jun 2017

Caspian Hydra Technologies LLC, a part of MSDL Group of Companies, has successfully completed construction and loading of LQP-2 topside on transportation and installation barge “Yu. Kuvykin” at V. Filanovsky field.
The works are performed under the Contract No 15V1000 dated 14.01.2016 with “LUKOIL-Nizhnevolzhskneft” LLC for development of working documentation, procurement of materials and equipment, performance of construction and installation works on topside and crossover bridge of LQP-2-IFP-2 and commissioning of LQP-2 of V.Filanovsky field.
Loading of topside weighting 1660 tons with mounting frame has been performed by skidding method onto barge using system of standjacks and skidbeams.
Construction of LQP-2 topside and first stage of preparation to marine operations have been successfully completed according to the contractual schedule. Transportation will start after installation of sea-fastenings and issue of tow certificate.
news170619_1

Pile foundation of Satellite Platform Substructure for Yu. Korchagin field has been successfully completed
 16 Jun 2017

Caspian Hydra Technologies LLC, a part of MSDL Group of Companies, has successfully completed pile foundation of Satellite Platform Substructure for Yu. Korchagin field in the Caspian Sea.
Works are performed under the Contract No. 16V1001 dated 12.11.2016 with “LUKOIL-Nizhnevolzhskneft” LLC for execution of marine operations on transportation and offshore installation of SP Substructure of Yu. Korchagin field (second stage of construction).
Driving of 8 piles 72m in length and weighting about 150 tons each was performed by using of the floating crane “Gurban Abbasov”. It allowed to drive full length piles without their extension at sea.
Pile driving equipment of ThyssenKrupp (Germany) and IHC (Germany) was applied for work execution. Swaging to pile guides of Substructure was performed by Hydra-Lok technology of Oil States Industries company (Great Britain).
Works have been performed according to the schedule with the achievement of project depth and pile carrying capacity.

news160619_2

Installation of Satellite Platform Substructure for Yu. Korchagin field has been successfully completed
 27 May 2017

Caspian Hydra Technologies LLC, a part of MSDL Group of Companies has successfully completed installation of Satellite Platform Substructure for Yu. Korchagin field in the Caspian Sea.
These works are performed under the Contract No. 16V1001 dated 12.11.2016 with “LUKOIL-Nizhnevolzhskneft” LLC for execution of marine operations on transportation and offshore installation of SP Substructure of Yu. Korchagin field (second stage of construction).
Towage of SP Substructure weighing about 2400t has been performed on the transportation pontoon, installation – by floating crane “Volgar”.
Substructure has been installed at a depth of about 12 meters in project parameters of surface level and angular coordinates.

news170530_1

news170530_2
_______________

Caspian Hydra Technologies LLC is an EPCI Contractor for construction of offshore oil & gas facilities; it performs hydraulic engineering and dredging works with its own fleet and maintains technical management of vessels.

A unique platform installation has been successfully completed in the Caspian Sea
 27 Apr 2017

“Caspian Hydra Technologies” LLC, a part of MORSHELF Group of Companies, has performed installation of Ice-resistant fixed offshore platform (IFP-2) Topside onto Substructure within the Second stage of development of V. Filanovskiy field.
The works are executed under the Contract No 15V0495 dated 15.07.2015 with “LUKOIL-Nizhnevolzhskneft” for execution of Marine Operations on transportation and offshore installation of objects at V. Filanovskiy field (Second stage).
IFP-2 Topside has been installed by float-over method – crane-free installation of platform’s Topside by means of transportation barge, which is moored directly along the Substructures or in the slot between them. This is the first time when float-over installation has been performed by a Russian company, previously such operations were executed only by foreign Contractors. Weight of IFP-2 Topside is 7150t, 11 vessels were engaged for transportation and installation of the platform.
Installation of IFP-2 Topside has been successfully executed within the contractual schedule. Moreover, the Marine Operations were performed in the very beginning of the navigation season (in April) during extremely difficult navigation conditions.

news11-блок-кондуктор2

news11-блок-кондуктор1

Construction of Block-Conductor Substructure for Yu. Korchagin field is completed
 26 Apr 2017

“Caspian Hydra Technologies” LLC, a part of MORSHELF Group of Companies, has successfully completed construction of Block-Conductor Substructure for Korchagin field and commenced its transportation to the Caspian Sea.
The works are executed under the Contract No 15V0999 dated 01.02.2016 with “LUKOIL-Nizhnevolzhskneft” LLC, for development of working documentation, procurement of materials and equipment, construction and commissioning of Block-conductor (ice-resistant fixed offshore platform) within the Second stage of construction of Yu. Korchagin field.
Towage of BC Substructure weighing about 2400t is being performed on the transportation pontoon “Rakhman Sharifov” with support of pusher-tugs. Meanwhile construction of BC Topside is in progress.
Construction of BC Substructure has been completed within contractual schedule.

news12-блок-кондуктор2

news12-блок-кондуктор1

Transportation of IFP-2 Substructure
 31 Jul 2016

 

DSC05991

DSC05913

 

On July 31, 2016 Caspian Hydra Technologies LLC (CHT LLC) commenced transportation of IFP-2 Substructure and piles right from the construction site of Galaktika Shipyard to V.Filanovsky field offshore. On 9 August, 2016 the Substructure was successfully positioned onsite. At the moment the workers complete the pile driving operations. The works are performed within the frameworks of the Contract on Marine Operations for transportation and offshore installation of objects at V.Filanovsky field. The contract is made between LUKOIL-Nizhnevolzhskneft LLC and Caspian Hydra Technologies LLC.


 23 Jun 2016

untitled-5674

untitled-5806

untitled-5830

untitled-6001

Ahead of schedule Caspian Hydra Technologies LLC has performed a part of dredging works at 148.0-151.0 km of the Volga-Caspian Channel. On 14 June 2016 the Company has transferred the dredger Caspiy to another site 133.5-134.55 km of the VCC.

According to the schedule the works shall be performed until 30 September 2016, but the works can be completed even earlier.

In general, the total of 6 mln m³ of mud should be lifted alongside the VCC in 2016. CHT LLC is engaged to lift 880 thousand m³ thereof. To succeed in the operation Caspian Hydra Technologies LLC has mobilized about 10 technical units: Dredger Caspiy, guard ship PRP-20 no.56, Steamboats Gandurinsky and LS-77, floating transporter PTS-M and a number of other vessels.

The fast and qualitative performance of the dredging works has become possible due to highly qualified personnel of CHT LLC and modern facilities the Company possesses.


 20 Jan 2016

On January 20, 2016 A.Shamsuarov – Senior Vice-President of LUKOIL PC visited LQ-2 Platform at Krasnye Barrikady Shipyard. Later A.Shamsuarov held a meeting with representatives of CHT LLC and Keppel Singmarine. During the meeting representatives of Caspian Hydra Technologies LLC reported on the works already performed under the contract with LUKOIL-Nizhnevolzhskneft LLC. The Customer commended CHT’s efforts in realization of the project.


 19 Jan 2016

On January 19, 2016 a group of experts from KEPPEL Singmarine headed by Poon Tai Lum – General Manager (Commercial/ Marketing) visited our office in Astrakhan. KEPPEL Singmarine is our strategic partner within the frameworks of the projects for construction of the Satellite Platform and LQ-2. As a result of the two-day visit of KEPPEL’s experts to Astrakhan, our companies signed a Letter of Intention which will be the basis of the Consultancy Services Agreement.

 

20012016


 15 Jan 2016

On January 15, 2016 our company commenced works on further constructions of LQ-2 Platform at Krasnye Barrikady Shipyard.


 13 Jan 2016

On January 13, 2016 a group of GL Noble Denton headed by Shai Tzucker visited our Astrakhan office. Our company had previously concluded a contract with GL Noble Denton for Consultancy Services within the frameworks of marine operations performed under contract with LUKOIL-Nizhnevolzhskneft LLC on V.Filanovsky field development (stage II). During the kick-off meeting we agreed on the scope of work and an agreement was reached to cooperate in prospective projects.


 31 Dec 2015

On December 31, 2015 Astrakhan Branch of FSUE ROSMORPORT awarded our Company with a contract for dredging and repair works in the Volga-Caspian Canal sector 148,0 – 151,0 km. The scope of dredging is 800 000 m3.


 28 Dec 2015

On December 28, 2015 CHT LLC successfully completed dredging operations in the Volga-Caspian Canal having performed the full scope of works above 1 million m3.


 15 Dec 2015

On December 15, 2015 LUKOIL PC intrusted further construction of LQ-2 at Krasnye Barrikady Shipyard to Caspian Hydra Technologies LLC.


 26 Nov 2015

Caspian Hydra Technologies LLC was appointed a Contractor elaboration of working documentation, purchase of equipment and materials, construction and commissioning of Satellite Platform (Offshore Ice Resistant Platform) for Second Stage of Yu.Korchagin field Construction.

Singapore
 10 Sep 2015

Preparation of the two OSVs and one MDRV to dry tow to V.Filanovsky oilfield (North Caspian Sea).

150910_singapour_1

150910_singapour_2

150910_singapour_3


 15 Jul 2015

Today we signed a contract for performance of marine operations: transportation and offshore installation of V. Filanovsky oilfield development facilities (second stage) with Lukoil-Nozhnevolzhskneft, Ltd.


 20 Apr 2015

In 2014 a regular repair of the dredger “Caspiy” prevented us from starting the operations in the VCC before September, and the amount of the dredged material was only 260 000 m3, whereas in 2015 the initial scope of works is equal to 500 000 m3 with a potential to increase up to 850 000 m3. The said amount is essential for the VCC in the view of the Caspian Sea level decrease by 74cm. During the periods of strong winds, the upper edges of ditch get exposed that becomes an obstacle to performance of technological operations related to handling of anchors and serving the floating dredger pump. In order to do away with such obstacles our company has purchased a powerful floating transporter PTS-M.

We are in the channel again!
 16 Apr 2015

On March 16th 2015, Federal State Unitary Enterprise ROSMORPORT awarded to Caspian Hydra Technologies a contract for performance of dredging at 146,0-152 km of Volga Caspian Channel in 2015. Subsequently we signed a contract for the said works on the 8th of April whereunder Caspian Hydra Technoligies is supposed to evacuate 500 cubic meters of soil in the period from 16.04 thru 15.08.2015.

In full compliance with the calendar plan we have mobilized our dredging spread consisting of the dredger “Caspiy” and two auxiliary vessels and started works. Positioning of the dredger took us a day only and now it under operation.

kgk_news_201504_1

kgk_news_201504_2


 10 Feb 2015

t1
Caspian Hydra Technologies LLC has purchased a floating transporter PTS-M in order to serve the floating dredger pump in shallow waters and to handle anchors during dredging operations in the VCC.


 30 Oct 2014

Caspian Hydra Technologies LLC is actively involved in dredging works in the VCC. After the winning a tender of FSUE Rosmorport in September of current year our company have been performing the operations in the region of 148-150 km of VCC since September 28. The first work site (from 150 to 151 km) has been put under design depth 5,5 m with no comments and remarks and now ship drivers can feels themselves comfortable during the passing of this site of VCC. Now we are working at the site from 148 to 150 km and there are no doubts that the design depths will be achieved in a short time.


 10 Oct 2014

news1

In order to work with floating dredger pump in the shallow waters there was produced a pontoon for the project of dredging works in the VCC.

Routine maintenance of dredger Caspiy completed
 26 Sep 2014

Astrakhan SLIP shipyard has completed routine maintenance of dredger Caspiy for acknowledgement of RMRS class. Maintenance included improvement works of operational specifications of technological equipment such as:

  • Full repair of suspension supports of straw frame with production and replacement of bronze bearings and with reconstruction of support pins
  • Repair of soil pump and impeller wheel
  • Repair of ball seal valve of turning bend of ship hydraulic fill line

After repairing RMPS issued classification and other certificates for the right of operating of dredger Caspiy valid till April, 2019.


 05 Aug 2014

The Company signed a Contract with Bumi Armada Caspian, LLC for performance of spool installation job at V. Filanovsky oilfield.

After successful completion of operations in the Baltics our dredger Caspiy returns to the port of registry
 25 Jul 2014

After successful completion of operations under Bronka port construction project in Leningradsky region and wintering anchoring, our dredger Caspiy returned back to the port of registry in Astrakhan. Towing was carried out by Ark-Shipping.

High-precision navigation comes to help marine constructors
 16 Jul 2014

Caspian Hydra Technologies LLC purchased high-precision navigation equipment from NONIUS, LLC (St. Petersburg) in order to improve and expedite subsea operations assisted by deep water pump DOP-350 manufactured and supplied by DAMEN.


 20 Jun 2014

Caspian Hydra Technologies LLC signed a Time Charter Party with LUKOIL-Nizhnevolzhsknef LLC for the vessel ARKTIC to be operated at V. Filanovsky oilfield in the North Caspian sea.

Discovered, identified and lifted
 04 Jun 2014

Under the order of BUMI ARMADA CASPIAN, LLC (Astrakhan) which discovered an unknown object at the sea bottom by way of an echo sounder in the midst of the subsea pipeline route connecting V. Filanovsky and Y. Korchagin oilfields, we performed survey and elevation of this object using Stolniy Grad Yaroslavl diving vessel. At the end of the day it happened to be a steel wire rope and fishing tackle which made together a huge snarl. Mobilization and passage of the diving vessel in the area of Y. Korchagin oilfield, searching and lifting of unknown object were finished within 3 days.


 05 May 2014

Caspian Hydra Technologies LLC signed a Time Charter Party with LUKOIL-Nizhnevolzhskneft LLC for the vessel TUR to be operated at V. Filanovsky oilfield in the North Caspian sea.


 05 Mar 2014

Caspian Hydra Technologies LLC signed a Time Charter Party with LUKOIL-Nizhnevolzhskneft LLC for the vessel TARPAN to be operated at V. Filanovsky oilfield in the North Caspian sea.


 21 Jan 2014

Caspian Hydra Technologies LLC and Bumi Armada Caspian LLC signed an Addendum to the SUBCONTRACT for performance of dredging operations at V. Filanovsky and Y. Korchagin oilfields on the north part of the Caspian sea.

Dredging Spread

Земснаряд Каспий
Cutter suction dredging vessel “Caspiy”

Земснаряд Каспий
Dredger Moguchy

Земснаряд Каспий
Booster Station BS 500

Земснаряд Каспий
Pontoons for hydraulic excavators


Services





About
Astrakhan
2a, Kalinina Str. / 80a, Babushkina Str Astrakhan, Russian Federation, 414000

Phone
+7 (8512) 51-40-53, +7 (8512) 51-40-54, +7 (8512) 51-39-45
Moscow
Mytnaya str. 22, building 1 Moscow, Russian Federation, 119049

Phone
+7 (499) 236-7923, 236-7962
Fax
+7 (499) 236-7962